|
 |
|
|
|
|
|
...
[Official] Lot Owners Report Or loose your lot!
 |
|
 |
| |
Knife  |
Posted: Wednesday, Feb 22 2006, 19:41
|
Tits.

Group: Moderators
Joined: Jul 11, 2004



|
All Myriad lot owners please read this topic!This does not include GTI members Ok, quite simply, if you own a lot and have not released it you must post here. This is so that Myriad can get back on track and we can find out what different members and their lots status are. Even if it's obvious you are working on your lot still you MUST still post here. All lot owners with outstanding lots will be contacted by PM and told to post here or loose their lot. From after that PM you will have 2 months to respond. If you do not respond after a month another PM will be sent and an e-mail as well. Every attempt to contact lot owners will be made. This is the format that you must post in and please fill in all the sections: | CODE | [b]Lot number: [/b] [b]Lot description: [/b] [b]Lot completion status: [/b] [b]Estimated time until finished: [/b] [b]Other notes: [/b] [b]Picture of current lot status and/or description: [/b] |
Which will look like so: Lot number: illcom_c5_r6 Lot description: Small company building Lot completion status: Basically ready for release Estimated time until finished: A week or two Other notes: None Picture of current lot status and/or description: Pic 1If you have more than one lot you will have to post each one separately unless the lots are joined together as one. Lot owners who need to reply:
JFIFI Blatent (2) Superb@ll (2) GTAuron TGR
Redkiller (8) (Gforce)
Knife (2)
Gforce
DieselGT - Lot unwanted
Steve-M
TRN4L
Snow Racer - lot unwanted
Cran.
Decay (4) - not wanted
JasonB (4)
AleXXX (3)
Delfi (2) - c4_r11 not wanted
When you post you will be crossed off the list and you will have a further 4 months to complete your lot.Lots and their owners are based on this map image PLEASE, NO OFF TOPIC POSTS, ONLY PEOPLE WHO OWN LOTS AND ARE USING THE RIGHT FORMAT ARE TO REPLY HERE! If you spot a mistake or have any other comments please PM me or another MICC member. .
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
JasonB  |
Posted: Thursday, Feb 23 2006, 07:32
|
GTA-SA/GTA-VC/GTA3 Modder Extraordinaire

Group: Members
Joined: Aug 24, 2002

|
Lot number: illcom_c2_r12, illcom_c3_r12, illcom_c4_r12, illcom_c5_r11 Lot description: Docks, industrial plants, nuclear power station, train station Lot completion status: 70% Estimated time until finished: Few weeks hopefully Other notes: Arrr me hearties Picture of current lot status and/or description:

Lot number: illsub_c1_r3, illsub_c1_r4 Lot description: Mansions Lot completion status: 97% Estimated time until finished: Not long. When I put it in game and add generics it is done. Other notes: Nope Picture of current lot status and/or description:

Lot number: illcom_c3_r5, illcom_c6_r4 (completing it for Delfi), illcom_c7_r4 Lot description: Business headquarters, museum, upscale shops and swanky movie theater Lot completion status: 80% Estimated time until finished: Few weeks Other notes: Fancy pants museum exhibits for the win Picture of current lot status and/or description:

Lot number: illcom_c10_r7, illcom_c10_r6 (disputed) Lot description: Bridge to my island, ferry docks, old housing, remains of stormwater canal Lot completion status: 70% Estimated time until finished: Unsure Other notes: I seriously need this lot, the bridge can't really go anhywhere else and it need to go on that coast, and one lot isn't enough to get the road to the meet the bridge without having a ridiculous gradient. Picture of current lot status and/or description:

Since I'm supposed to be co-running the lot thingy, I though it would be best if I were to complete this right away 
Knife: Thank you Jason, you are now crossed off the list. This post has been edited by Knife on Thursday, Feb 23 2006, 08:13
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
AleXXX  |
Posted: Thursday, Feb 23 2006, 08:24
|
(-:-)

Group: Members
Joined: Apr 19, 2004


|
Lot number: illcom_c2_r2 Lot description: Corporation skyscraper Lot completion status: 95% (add lawn and generic stuff) Estimated time until finished: 2 / 3 weeks Other notes: None Picture of current lot status and/or description:  Lot number: illsub_c1_r2 Lot description: Mansions Lot completion status: 75% Estimated time until finished: Few weeks Other notes: It's the second lot version. In the first version I wanted to make one large house, but then I've understood, that it isn't realistic. Picture of current lot status and/or description:  Why 75%? Because in LOT folder: 7 houses (4 unfinished), 3 pools and 2 garages. And please, write header XXX in my Nick. Knife: I will cross you off after you show your mansion lot  Knife 2: Ok, your lots are safe This post has been edited by Knife on Thursday, Feb 23 2006, 19:55
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
steve-m  |
Posted: Thursday, Feb 23 2006, 13:34
|

Group: Members
Joined: Jul 26, 2002



|
Lot number: illcom_c5_r1 Lot description: start of East Tank Bridge; sewage works planned Lot completion status: (empty) alpha version released Estimated time until finished: no idea  Picture of current lot status: old render
---
Lot number: illcom_c2_r10 Lot completion status: discontinued, please set status to available
---
Lot number: illcom_c4_r1 Lot description: Odie's Nasty Chemicals plant Lot completion status: unknown Estimated time until finished: N/A Other notes: I'm taking this over, since it's next to my sewage works, and was planned to be put together anyway. However, I have no idea if I'll still be able to get his files somehow. Picture of current lot status: see here
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
JernejL  |
|
Big Homie

Group: Retired Staff
Joined: Mar 11, 2002



|
Lot number: C6_R4 Lot description: Museum Lot completion status: 90% Estimated time until finished: weeks Other notes: the lot is being finalized by JasonB Picture of current lot status and/or description: no pics, it is a secret EDIT: i only have 1 lot currently under constructions (topic first post says 2 which is WRONG), other two (post office and massisesoft corp. were released and completed) Knife: The map says you own c4_r11 and its yet to be released. Seems like you don't need/want it though so I will delete your name from it. This post has been edited by Knife on Saturday, Feb 25 2006, 10:29
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
Cran.  |
Posted: Saturday, Feb 25 2006, 00:47
|
910 reprisent

Group: Members
Joined: Apr 20, 2004


|
Hello! Lot number: illcom_c2_r1 Lot description: A commercial lot with a small italian resturant, TV studio, Buisness HQ and a small company building. Lot completion status: Approx. 90% ATM. Most of the texturing has been completed, pretty much all modeling has been completed (Unless I come up with another thing to place there). If I don't add anything, lot will just be textured, then some trees and long grass will be added to fill up empty spaces. Estimated time until finished: Unsure until ingame, but as far as things in zmodeler go, i'd say (If i'm not too lazy) 1-2 weeks and it will be ready for porting ingame. Then it's just a matter of time until I get my sh*t ready and import it into game (May need some assisting that this point, although I have got it into VC Myriad, just the lot wasn't roatated correctly and textures didn't work properly) Other notes: As said, may need assistance to get ingame. As soon as I finish the behind the scenes work, I don't see long unitl a beta release. NOTE: In that Pic, I have to reassign a few materals... haha! Picture of current lot status and/or description:  Knife: Ok, your lot is safe This post has been edited by Knife on Saturday, Feb 25 2006, 10:30
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
Gforce  |
Posted: Saturday, Mar 18 2006, 06:56
|

Group: Members
Joined: Sep 17, 2003



|
ooh the month's deadline is almost up sorry Knife but i can't be bothered to follow your posting format for this thread, all 3 lots that have my name on them on the map are still WIP, simply do a search of the PPT and you will see that my last progress pics (CHECK OUT THE DATES ON MY PICS  ) of my lots were actually ingame SA or "VC style" zmodeler screenshot's, i am still working on converting my generic glass pack that i never released for MI-VC, which will hopefully be finished in the next week and incorporated in the next MI-GTI-SA baseland installer which is also needed for all 3 of my lots to work, if you feel i should have my lot's taken away from me due to the lack of progress pics, that's not a problem to me. lack of progress on my lot's can only be put down to me having to learn the general working's of GTA-SA modding and how GTI was put together, learning how to do some basic SA .scm coding (i actually miss barton)... then moving the entire map to a new location and releasing a baseland installer for you guy's to play with.
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
Knife  |
Posted: Saturday, Mar 18 2006, 08:52
|
Tits.

Group: Moderators
Joined: Jul 11, 2004



|
Allrighty TRN, SR and Gforce... list updated. btw, decay gave up all his lots
|
|
|
|
|
 |
|
 |
 |
|
 |
| |
0 User(s) are reading this topic (0 Guests and 0 Anonymous Users)
0 Members:
Pages:
(2) [1] 2
Track this topic
Receive email notification when a reply has been made to this topic and you are not active on the board.
Subscribe to this forum
Receive email notification when a new topic is posted in this forum and you are not active on the board.
Download / Print this Topic
Download this topic in different formats or view a printer friendly version.
| |
 |
|
 |
|
|
|
|